Jack Collier

Wednesday, 6 February 2013

Work schedule

This image below is my calendar layout for my work schedule over the next few weeks in February.


Posted by Jack Collier at 11:05
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Planning

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Labels

  • Audience Feedback (1)
  • Construction (25)
  • Evaluation (13)
  • Final magazine pages (4)
  • Note To Moderator (1)
  • Planning (16)
  • Prelim (3)
  • Research (11)

Blog Archive

  • ►  2014 (7)
    • ►  April (3)
    • ►  March (4)
  • ▼  2013 (75)
    • ►  May (7)
    • ►  April (8)
    • ►  March (17)
    • ▼  February (26)
      • Final draft of contents page (with audience feedback)
      • 2nd Draft contents
      • 1st draft contents
      • Mrs D
      • Contents pre-construction
      • Contents pre-construction
      • Audience feedback
      • 4th Draft cover (final cover plan)
      • 3rd draft cover
      • Front cover update
      • 2nd draft cover (layout idea)
      • 1st draft cover (layout idea)
      • Main image for front cover of magazine
      • Mrs D
      • Double page spread layout design
      • Contents Layout Design
      • M.E.S choices
      • Test shots
      • The letter of acceptance
      • Synergy/house style across all 3 features
      • Work schedule
      • Audience feedback from Facebook
      • Layout Design 1
      • Mood Board
      • Logo ideas 1
      • Proposal Ideas: Ideas I learnt from the research o...
    • ►  January (17)

Contributors

  • EdgyMedia
  • Jack Collier
Ethereal theme. Powered by Blogger.